Hydro Water Well(K) LTD

Drilling Contractors

 
HYDRO GROUP | Water Well Borehole Drilling | Process
 

Drilling process

The drilling process begins with obtaining the necessary paperwork and authorizations that will allow us to mobilize our machinery to site.

The process is then broken down into the following stages:–

  1. Rig Set Up.
  2. Actual Drilling.
  3. Borehole Design.
  4. Plain & Screen Casing Pipe Installation.
  5. Well Development.
  6. Borehole Test Pumping & Well Disinfection.
  7. Well Capping.
  8. Reporting.
Enquire now